Laserfiche WebLink
Bowie No. 2 Mine <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />MR 146 <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2448 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />304.34 LCY/hr <br />304.34 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.820/LCY <br />Total job time: <br />Total job cost: <br />10.60 Hours <br />$2,644.67 <br />Page 3 of 5 <br />CIRCES Cost Estimating Software <br />