My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-27_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-01-27_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:24 PM
Creation date
2/11/2014 7:51:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/27/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Cost Sum <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Minor Revision <br />146 <br />Task #: OOE State: Colorado <br />Date: 1/24/2014 County: Delta <br />User: SLB <br />Agency or organization name: DBMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -00e <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />352 <br />353 <br />Re-topsoil Pitkin Mesa Pipeline corridor <br />DOZER <br />1 <br />1 <br />10.60 <br />$2,644.67 <br />$2,782.79 <br />Reseed Pitkin Mesa Pipeline Corridor <br />REVEGE <br />15.00 <br />SUBTOTALS: <br />25.6 <br />$5,427.46 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and /or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$109.63 <br />$56.99 <br />$0.00 <br />$542.75 <br />$709.37 <br />$6,136.83 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = $245.47 <br />Reclamation management and /or administration: <br />3.13% <br />$192.08 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,146.93 <br />TOTAL BOND AMOUNT (direct + indirect) = $6,574.39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.