My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:49 PM
Creation date
2/10/2014 2:17:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/7/2014
Doc Name
Response to weekly CQA adequacy
From
CC&V
To
DRMS
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"M <br />Clay (SLF) Processing: <br />Cameron Site: No clay mining or processing occurred at the Cameron Site. Approximately, 244,860 tons of clay / <br />soil liner fill (SLF) material have been produced at the Cameron site. SLF produced from the operation remains <br />stockpiled at Cameron Site for later removal / use. <br />Seven test pits were dug south of the Cameron area to locate further sources of clay. The test pits were excavated <br />using a Cat 320 excavator and ranged from 6 feet to 10 feet in depth. Clay was sampled from one of the test pits <br />for laboratory analysis (the rest of the test pits did not have useable amounts of clay). <br />Squaw Gulch Clay Borrow Site: Clay processing took place at the Squaw Gulch Clay Borrow Site. <br />Approximately, 21,900 tons of soil liner fill material has been produced at the Squaw Gulch Clay Borrow Site to <br />date. <br />A Cat 345 and a John Deere 870 excavator were used to load Cat 777 haul trucks with clay till at the upper portions <br />of the Squaw Gulch Clay Borrow area. The till was transported to lower portion of the borrow area for processing. <br />Underdrain System: <br />Secondary Underdrain: No secondary underdrain was installed during this reporting period. Approximately, 5,064 <br />feet of secondary underdrain has been completed to date in the VLF. <br />Primary Underdrain: No work was performed on the primary underdrain during this reporting period. A total of <br />1,294.60 feet of primary underdrain has been completed. <br />Tree /Slash Grubbing and Clearing, Chipping: <br />No clearing and grubbing occurred. <br />B) Underground Workings <br />UG U6397: Unknown Surface Working. <br />The working was blasted. <br />UG 6123: Collapsed Stope. <br />A Cat 330 excavator removed blasted material from the working. <br />C) Historical Crib Wall / South MSE Wall: <br />A Komatsu excavator was used to remove material from the back side of the crib wall to expose timbers to be used <br />for the facade at the south MSE wall. No timbers /panels were removed. <br />11) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation (Snow removal). <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Underground working basting and remediation; Production drilling and blasting; Tailings removal at the <br />historic Crib Wall; Test pitting for clay sources; and Clay (Soil Liner Fill —SLF) and Drain Cover Fill (DCF) processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF Sample Number 80 -S was collected and returned to Amec's laboratory for analysis. <br />Page 2 of 6 MLE2 WE 4Jan14.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.