My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-05_REPORT - M2012032
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2012032
>
2014-02-05_REPORT - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:23:20 PM
Creation date
2/6/2014 3:15:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Report
Doc Date
2/5/2014
Doc Name
Annual report map scanned separately
From
Star Mine Operations, LLC
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 29, 2014 <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman St. # 215 <br />Denver, CO 80203 <br />M- 2012 -032 Revenue Mine Annual Report <br />To Whom it May Concern, <br />Below are the comments in regards to each section of the annual report form which state "see <br />attached" <br />Part 4: <br />During the past year, construction efforts were continued for the underground mill including the <br />installation of concrete, steel and equipment. With the mill being in construction the site has not <br />processed any ore for the production of concentrate yet. The last date of activities on the site <br />was January 29, 2014, which is the date of this letter. <br />Part 14: <br />With no additional tailings or significant new volumes of waste rock being added to the surface <br />of the site, the areas which require reclamation are mostly historical. During the past year, the <br />mine has begun reclamation on the historical waste piles and will place appropriate soil on the <br />slopes of these waste piles. At this time the soil is not on site and cannot be brought to site <br />reasonably until after the winter season has passed. This is planned to occur during the <br />upcoming summer. <br />Part 20: <br />The permit requires quarterly water sampling results to be submitted and all of these have been <br />submitted already. The permit also requires the submission of SPLP tests for generated tailings; <br />however, no tailings have been generated in the past year as the mill is in construction and not <br />producing tailings yet. All other required items are still in construction and have not been able to <br />be tested as the site is not producing material yet. <br />Sincerely, <br />_ r <br />1 <br />R illiams � <br />ager <br />Star Mine Operations LLC <br />1675 Larimer St. Suite 820 <br />Denver, CO 80202 RECEIVED <br />FEB 0 5 2014 <br />Division of Reclamation, <br />Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.