Laserfiche WebLink
Natural Soda, Inc. 2013 Project Status Report & Annual Plan of Development <br />3.1.4 Regulatory Review <br />NSI submitted routine Sundry Notices, monthly, quarterly, and annual reports to <br />appropriate agencies. The following summarizes other regulatory related activities: <br />• NSI did not have to submit permit applications to the Colorado State Office of <br />Engineers for 2013 drilling activities. A permit application was submitted in November <br />of 2013 for the WSW -3 & WSW -4 water wells to be drilled and completed in 2014. <br />• NSI submitted SUP/TLQ permit applications to the Rio Blanco County that were <br />required for drilling operations in completed in 2013. <br />• NSI submitted permit applications to the EPA for the 8H, 9H, and 14H production well <br />pairs in 2013. The 14H -1 permit was approved in early January of 2014. <br />• The BLM APD for the 14H production well pair was submitted September of 2013, and <br />approved in January 2014. NSI submitted BLM APD's for the 8H production pair, 9H <br />production pair, and the DS -7 monitor well in January of 2014. <br />• NSI submitted P &A sundry notices to the BLM & DRMS respectively for the 1 -3A, 88 -1, <br />and the 90 -2. <br />3.2 Proposed 2014 Activities and Schedule <br /> <br /> <br /> <br />3.2.2 Well field <br />• NSI will continue limited production in the DVPW in 2014. <br />• The 8H, and 14H production well pairs are planned to be drilled and brought <br />online in 2014. <br />• NSI will drill and complete two new water wells in 2014, the WSW -3, and WSW - <br />4. Location of these wells is to the north of the plant and can be referenced in <br />Figure 3 and Figure 4. <br />• NSI plans to also drill and complete one new monitor well near the southwest <br />portion of Section 26. This well will be the DS -7 it is shown on Figure 3 of this <br />report. <br />• NSI is not currently planning for any well plugging and abandonment in 2014. <br />DAUB & ASSOCIATES, INC. j� 8 January 2014 <br />