Laserfiche WebLink
AA Natural Soda, Inc. 2013 Project Status Report & Annual Plan of Development <br />2.2 Leasehold Status <br />The original four sodium leases were renewed by the BLM, in 2011 for a period of ten <br />years. Annual rental and minimum royalty payments were submitted to the Mineral <br />Management Service. <br />3.0 Project Status <br /> <br /> <br /> <br /> <br /> <br />3.1.1 Items of Significance <br />• Three older monitor wells were plugged and abandoned, the 1 -3A, 88 -1, and <br />the 90 -2. <br />• The DVPW continued limited production in 2013. <br />• The 13H production pair was drilled and completed in August/September of <br />2013. Injection was commenced in December of 2013. <br />• The 10H-1V slant recovery well was drilled and completed in July /August of <br />2013. This allowed the 1 OH cavity to resume production in August of 2013. <br />• NSI successfully completed the 2012 goal of installing a new flash dryer and <br />the addition of a second production line in 2013. <br />DAUB & ASSOCIATES, INC. �p �pK_ 6 January 2014 <br />