My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-05_REPORT - C2010089
>
Day Forward
>
Report
>
Coal
>
C2010089
>
2014-02-05_REPORT - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:42 PM
Creation date
2/6/2014 9:41:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Report
Doc Date
2/5/2014
Doc Name
2012 ARR Review
From
DRMS
To
TRI-State Generation and Transmission Association, Inc
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
DIH
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM: Jim Stark <br />SUBJECT: New Horizon North 2012 Annual Reclamation Report Review <br />DATE: 21 January 2014 <br />Per Dan's request I have reviewed the 2012 New Horizon North's Annual Reclamation Report. <br />During the 2012 construction year the only work that was done at the mine was preproduction <br />work. Western Fuels built pond NHN1 and stripped and stockpiled 112,000 CY of mixed topsoil <br />and 45,000 CY of Progresso topsoil, which is stockpiled separately from the mixed topsoil. In <br />all, 76.4 acres have been disturbed at the New Horizon North Mine. All of the acreage numbers <br />reported on the standardized ARR Report form were consistent with the work performed at the <br />site during 2012. <br />The Division does not have any questions or comments regarding the New Horizon North's 2012 <br />Annual Reclamation Report. Please let me know if you have any questions or need any <br />additional information. <br />John W. Hickenlooper <br />INTEROFFICE <br />Governor <br />MEMORANDUM <br />Mike King <br />Executive Director <br />TO: Mike Boulay <br />Loretta E. Pineda <br />Director <br />FROM: Jim Stark <br />SUBJECT: New Horizon North 2012 Annual Reclamation Report Review <br />DATE: 21 January 2014 <br />Per Dan's request I have reviewed the 2012 New Horizon North's Annual Reclamation Report. <br />During the 2012 construction year the only work that was done at the mine was preproduction <br />work. Western Fuels built pond NHN1 and stripped and stockpiled 112,000 CY of mixed topsoil <br />and 45,000 CY of Progresso topsoil, which is stockpiled separately from the mixed topsoil. In <br />all, 76.4 acres have been disturbed at the New Horizon North Mine. All of the acreage numbers <br />reported on the standardized ARR Report form were consistent with the work performed at the <br />site during 2012. <br />The Division does not have any questions or comments regarding the New Horizon North's 2012 <br />Annual Reclamation Report. Please let me know if you have any questions or need any <br />additional information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.