Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one): <br />JU Cropland(CR) 7 Pastureland(PL) <br />7 Rangeland(RL) 7 Forestry(FR) <br />F1 Residential(RS) 7 Recreation(RC) <br />ZIDeveloped Water Resources(WR) <br />13. Primary Present land use (check one): <br />ElCropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />�j Wildlife Habitat(WL) <br />LJ Industrial /Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />loader <br />15. On Site Processing: I T L Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): l AL , 1 ��.(7 <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />n/a <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Exhausted the resources within the existing 110 permit area and need additional reserve,_ <br />stockpile and operational space. Mining and processing methods will be the same. <br />