Laserfiche WebLink
Bowie No. 2 Mine (Permit No. C1996083)Minor Revision No. 146 <br />Stipulations <br />31 - Prior to removal of topsoil along the Pitkin Mesa pipeline, all snow in the topsoil removal <br />area shall be removed. Topsoil may not be removed if ground conditions are wet or snowy. <br />Photographic documentation of conditions at topsoil removal shall be recorded and submitted <br />to the Division. <br />32 - Prior to excavation through Stevens Gulch Road, Bowie Resources, LLC must submit, <br />to the Division, documentation of Delta County's acknowledgement of the excavation <br />activities within the roadway. <br />33 - Prior to any Pitkin Mesa Pipeline replacement disturbance, Bowie Resources, LLC <br />(BRL) must determine which subsidence monuments located over the replaced pipeline <br />segment will be disturbed. Any monuments that will be disturbed by the pipeline replacement <br />must be surveyed prior to removal, reset, and surveyed again, with the reset positions calibrated <br />relative to the original locations. No undermining of the pipeline may occur until the <br />monuments are in place and surveyed. BRL must include the survey data and a brief <br />discussion of the relocated monument positions in its next Semi - Annual Subsidence Report. <br />