My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-04_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-02-04_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:41 PM
Creation date
2/4/2014 12:24:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/4/2014
Doc Name
Copy of Approved Revision sent to OSM
From
J.E. Stover & Associates, Inc
To
OSM
Type & Sequence
MR146
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (Permit No. C1996083)Minor Revision No. 146 <br />Stipulations <br />31 - Prior to removal of topsoil along the Pitkin Mesa pipeline, all snow in the topsoil removal <br />area shall be removed. Topsoil may not be removed if ground conditions are wet or snowy. <br />Photographic documentation of conditions at topsoil removal shall be recorded and submitted <br />to the Division. <br />32 - Prior to excavation through Stevens Gulch Road, Bowie Resources, LLC must submit, <br />to the Division, documentation of Delta County's acknowledgement of the excavation <br />activities within the roadway. <br />33 - Prior to any Pitkin Mesa Pipeline replacement disturbance, Bowie Resources, LLC <br />(BRL) must determine which subsidence monuments located over the replaced pipeline <br />segment will be disturbed. Any monuments that will be disturbed by the pipeline replacement <br />must be surveyed prior to removal, reset, and surveyed again, with the reset positions calibrated <br />relative to the original locations. No undermining of the pipeline may occur until the <br />monuments are in place and surveyed. BRL must include the survey data and a brief <br />discussion of the relocated monument positions in its next Semi - Annual Subsidence Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.