My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-31_INSPECTION - C1981013 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981013
>
2014-01-31_INSPECTION - C1981013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:27 PM
Creation date
2/4/2014 8:36:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Inspection
Doc Date
1/31/2014
Doc Name
Inspection Report
From
DRMS
To
Greg Smith
Inspection Date
1/8/2014
Email Name
LDS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 8, 2014 C- 1981 -013 /Golden Eagle Mine LDS <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />NA -Air Resource Protection <br />R -Availability of Records <br />NA - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />NA -Other <br />NA - Processing Waste <br />Y -Roads <br />Y - Reclamation Success <br />Y - Revegetation <br />NA - Subsidence <br />NA - Slides and Other Damage <br />NA - Support Facilities On -site <br />R -Signs and Markers <br />Y - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />NA - Topsoil <br />COMMENTS <br />This was a complete inspection by Leigh Simmons of Colorado Division for Reclamation, Mining and <br />Safety, (the Division). No representative of New Elk Coal Company (NECC) was present. The weather was fine, <br />although there was still snow on the ground from a storm the preceding weekend. Two permitting actions are in <br />progress, these are detailed under the heading GENERAL MINE PLAN COMPLIANCE. <br />AVAILABILITY OF RECORDS — Rule 5.02.4(1): <br />The records were available in the Technical Services building at the New Elk Mine. Detailed comments <br />are made at the end of this report. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.053; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />The bales in the erosive area at the north edge of the disturbance boundary were in place. <br />GENERAL MINE PLAN COMPLIANCE: <br />TR57 is in progress. The proposed decision due date has been extended to January 31, 2013. The Division <br />is waiting on a response to the last adequacy review. <br />An application for Permit Renewal (RN6) was received on December 19, 2013. The Division found the <br />application complete on December 23, 2013. <br />SIGNS AND MARKERS — Rule 4.02: <br />The mine ID sign was in compliance. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.