Laserfiche WebLink
January 8, 2014 C- 1996- 084 /Lorencito Canyon Mine LDS <br />possible. During the winter pond cleaning season, or before, the weir boxes should be cleaned out, and <br />accumulated sediment cleared from the primary spillway risers. <br />GENERAL MINE PLAN COMPLIANCE: <br />At present two permitting actions are progress: <br />RN-31 - The proposed decision due date has been extended to January 31, 2014. The Division is waiting on <br />a response from NECC regarding inconsistencies resulting from a query of the AVS database. <br />TR18 - The proposed decision due date has been extended to June 1, 2014. The Division is awaiting a <br />response to the adequacy letter of May 29, 2013. <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.031. 1(5) and <br />(6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />The roads were in good shape around the site. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The results of the 2013 vegetation sampling, conducted by Arcadis, had not yet been sent to NECC. The <br />Division is interested in the sampling results as they will inform any plan to achieve bond release at Lorencito <br />Canyon. It should be noted however, that certain "problem areas" around the site (for example, the steep slope <br />above the road to pond 6) are actively eroding and are not likely to meet the criteria necessary for bond release <br />until significant action is taken. <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />There are various areas around the site where erosion was repaired late in 2013, these areas will need to <br />be re- seeded ready for the 2014 growing season. <br />SIGNS AND MARKERS — Rule 4.02: <br />All signs were in compliance. <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions are in progress and none are necessary as a result of this inspection. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 11 <br />