Baseline Hydrologic Monitoring Plan – Hansen Project 55
<br />Hem, John D., 1985. Study and Interpretation of the Chemical Characteristics of Natural Water, Third
<br />Edition, U.S. Geological Survey Water Supply Paper 2254. 263 pp.
<br />Nelson- Moore, J.L., Collins, D.B., and Hornbaker, A.L., 1978, Radioactive mineral occurrences of
<br />Colorado: Colorado Geological Survey Bulletin 40, 1054 p., 12 pl.
<br />Nelson- Moore, J.L., Collins, D.B., and Hornbaker, A.L., 1978. Radioactive mineral occurrences of
<br />Colorado: Colorado Geological Survey Bulletin 40 (reprinted as a CD -ROM, 2005)
<br />Rampart Exploration Corporation, 1979. High Park Test Pit Final Report (Unpublished). December, 1979
<br />Smith, Steven M., 2006. National Geochemical Database — Reformatted Data from the National Uranium
<br />Resource Evaluation (NUKE) Hydrogeochemical and Stream Sediment Reconnaissance (HSSR)
<br />Program, Version 1.40 (2006), USGS OFR 97 -492
<br />Theim, G., 1906. Hydrologische methode. Leipzip, Gebhardt, 56 pp.
<br />Theis, C.V., 1935. The Relation Between the Lowering of the Piezometric Surface and the Rate and
<br />Duration of Discharge of a Well Using Groundwater Storage, American Geophysical Union
<br />Transactions, v.16, pp. 519 -524.
<br />Western Water & Land, 2010. 2009 Progress Report: Taylor Ranch Project, Fremont County, Colorado,
<br />prepared for Fremont County Board of Commissioners and Mr. Bill Giordano, March 17, 2010. 10
<br />pp., plus enclosures.
<br />Western Water & Land, 2012. 2010 Progress Report: Taylor Ranch and South T -Bar Area Uranium
<br />Exploration Project, Fremont County, Colorado, prepared for Fremont County Board of
<br />Commissioners et. al., July 10, 2012. 13 pp., plus attachments.
<br />Western Water & Land, 2012. 2011 Progress Report: Taylor Ranch and South T -Bar Area Uranium
<br />Exploration Project, Fremont County, Colorado, prepared for Fremont County Board of
<br />Commissioners et. al., July 10, 2012. 13 pp., plus attachments.
<br />Western Water & Land, 2013. 2012 Progress Report: Taylor Ranch and Hansen Site Uranium Exploration
<br />Project, Fremont County, Colorado, prepared for Fremont County Board of Commissioners,
<br />August 2, 2013. 15 pp., plus figures and tables.
<br />Whetstone Associates, 2008a. Taylor Ranch Project Baseline Hydrologic Monitoring Plan, prepared for
<br />Black Range Minerals, October 6, 2008. Report No. 4153A.081006. 32 pp, plus figures and
<br />attachments.
<br />Whetstone Associates, 2008b, Taylor Ranch Project Domestic Water Supply Monitoring Plan, prepared
<br />for Black Range Minerals, October 8, 2008. Report No. 4153A.081008. 11 pp., plus figures and
<br />attachments.
<br />Whetstone Associates, 2009. "Reduced Analytical Suite for Taylor Ranch Monitoring," Technical
<br />Memorandum (TM11) to Bruce Smith (Western Water & Land). Document 44153A.090419,
<br />April 19, 2009. 3 pp
<br />Whetstone Associates, 2010a. "Proposed Modifications to Taylor Ranch Monitoring Plan ", technical
<br />memorandum to Ben Vallerine, Black Range Minerals, and Bill Giordano, Fremont County
<br />Planning Director, from Susan Wyman, P.E., P.G., Whetstone Associates. April 30, 2010,
<br />document number 4153A.100430. 9 pp., plus figures.
<br />Whetstone Associates, 2010b. "Surface Water and Domestic Water Monitoring Locations, Frequency, and
<br />Analytical Suite for the Taylor Ranch Project ", technical memorandum to Ben Vallerine, Black
<br />Range Minerals, and Bill Giordano, Fremont County Planning Director, from Susan Wyman, P.E.,
<br />P.G., Whetstone Associates. May 4, 2010, document number 4153A.100504. 9 pp., plus figures.
<br />4153A.140129 Whetstone Associates
<br />
|