Laserfiche WebLink
Baseline Hydrologic Monitoring Plan — Hansen Project 40 <br />Black Range Minerals <br />Project: Hansen Project / Taylor Ranch Completion Date, <br />Northing: Driller: <br />Easting: Hydrogeologist• <br />Ground Elev.. Screened Interval: 860 - 900 ft <br />Casing Elev.: Formation Echo Park Fm <br />pieptq <br />Well Completion <br />Lithollow <br />} <br />locking cap and <br />1. <br />(Approx. Example only) <br />0 <br />3" casing <br />shckup 2 0' <br />3 traffic posts at surface <br />-7 <br />0'- 40'• Alluvium <br />cement <br />r 3.- 19. 10" steel casing <br />8 weathered bedrock <br />surface seal <br />cemented in 14" borehole <br />100 <br />190' depth to water (bgs) <br />40, - 180, <br />Andesne <br />19'-840' PuregoldNolclay <br />bentomte grout <br />200 <br />300 <br />12'-86U blank casing <br />� 180' - 540' Tallahassee Creek <br />Fm <br />400 <br />600 <br />Centralizers (60 ft spacing) <br />600 <br />" 540' - 640' Wall Mtn Tuff <br />`'C` <br />`W <br />700 <br />5. <br />600'- 916• Echo Park Fm <br />840'-850' Cetco <br />:}4f}M1`}�`}: <br />coated bentonde pellet seal <br />;1:`:`},: <br />800 <br />880y Centralizers <br />860'-900' 0=-m slot <br />r ' {i <br />screen <br />`}r}, }•}• <br />•3� } }ii`}4`}, <br />850'-905' 8-12 gradation <br />900 <br />Colorado silica sand <br />900' -905' blank casing <br />9qy, Centralizers <br />905.915, fill <br />1000 <br />15'' total depth of <br />borehole <br />(drawing not to scale) <br />Figure 14. Example Well Completion Diagram for Deep Well <br />4153A.140129 Whetstone Associates <br />