Laserfiche WebLink
Baseline Hydrologic Monitoring Plan — Hansen Project 36 <br />Table 13. Proposed New Groundwater Monitoring Wells for Baseline Characterization <br />Monitoring <br />Monitoring <br />General Location / Strategy <br />Expected <br />Depth <br />Unit <br />Well Target' <br />Well ID <br />11 <br />ft <br />Ttml <br />MW -UP <br />TBD <br />Upgradient of Hansen Deposit <br />40 <br />Qal <br />MW -UP <br />TBD <br />11 <br />130 <br />Ttml <br />MW -UP <br />TBD <br />of <br />340 <br />Ttc <br />MW -UP <br />TBD <br />to <br />500 <br />Tep <br />MW -UF <br />TBD <br />Upgradient of Facilities <br />190 <br />Ttml <br />MW -UF <br />TBD <br />to <br />340 <br />Ttc <br />MW -UF <br />TBD <br />to <br />410 <br />PC <br />MW -F <br />MW -27 -292 <br />Characterize Hansen above PT Fault <br />25 <br />Ttml <br />MW -F <br />MW -27 -293 <br />of <br />300 <br />Ttc <br />MW -F <br />MW -27 -294 <br />to <br />760 <br />Tep <br />MW -DG <br />MW -27 -290 <br />Downgradient <br />25 <br />Qal <br />MW -DG <br />MW -27 -291 <br />it <br />260 <br />Tcg <br />TOTAL <br />12 <br />NOTES: <br />Well site target names are temporary. Final well IDs will be assigned when each well is drilled. <br />2 Target depths are estimated and the final determination will be made in the field, based on the geology encountered during drilling <br />TBD = To be determined, well IDs will be assigned sequentially during drilling <br />Qal = Quaternary Alluvium <br />Ttml = Thutynine Mile Andesrte <br />Tic = Tallahassee Creek Conglomerate <br />Tep = Echo Park Formation <br />PT Fault = Picnic Tree Fault <br />4153A.140129 Whetstone Associates <br />