Laserfiche WebLink
112c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />City of Golden <br />Permit Number: <br />M- 1977 -534 <br />Operation Name: <br />Empire Pit <br />County: <br />Clear Creek <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />January 30, 2014 <br />Permit Acreage: <br />138.58 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YE NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YE NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. ? <br />4. What was the date of last excavation, processing or hauling activity at the mine? /ilJ <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />� <br />RE ° *7� <br />C: ".a . �: a <br />10. Estimated new acreage to be affected in the next report year. <br />JAN 3 U 2014 <br />11. Estimated acres to be reclaimed in the next report year. <br />DIVISION OF RFCI..APOTInN <br />Li' Al- `, "' -�- "( <br />12. Total acres in various stages of reclamation, since permitted mining Mgklli�ies tegan: <br />YES �q <br />YES O <br />YES O <br />I�iS.Sg <br />b <br />21.a <br />0 <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />Opo <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />Iy`' <br />rate (tons): <br />Z <br />apvd fertilizer: <br />depth (in.): <br />fYt ( VI. <br />Seed <br />x / <br />Fertilizer <br />rVlaVLl. -[ <br />Mulch <br />f <br />application <br />^p <br />(� <br />application <br />L <br />u h to-h0-0'::1 <br />application <br />y^� <br />Co b�AA'L <br />method: <br />lN� �� <br />method: <br />method: <br />