My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-24_PERMIT FILE - C2010089 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2014-01-24_PERMIT FILE - C2010089 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:13 PM
Creation date
1/30/2014 12:24:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
PERMIT FILE
Doc Date
1/24/2014
Doc Name
Air Emission Permit
Section_Exhibit Name
Appendix 2.05.6(1)
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ERVRDIUNERT- <br />AIR POLLUTION CONTROL DIVISION _ <br />TELEPHONE: (303) 692 -3150 <br />,r r <br />CONSTRUCTION PERMIT's "` <br />PERMIT NO: I OM02275F <br />Initial Approval <br />DATE ISSUED: December 20, 2013 Modification 1 <br />ISSUED TO: Western Fuels- Colorado, A Limited Liability <br />Company <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Surface coal mine known as the New Horizon North Mine located in West '/2 of Section 25, <br />Township 47 North, Range 16 West, and Montrose County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Material extraction, including topsoil, drilling and blasting, overburden removal and coal <br />extraction, and truck haul to public roads. No coal processing takes place at this facility. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL <br />ACT C.R.S. (25 -7 -101 et sea), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS <br />DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />REQUIREMENTS TO SELF - CERTIFY FOR FINAL APPROVAL: <br />Within one hundred and eighty days (180) after commencement of operation, compliance with the <br />conditions contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions. Failure to demonstrate compliance within 180 <br />days may result in revocation of the permit or enforcement action by the Division. Information on how to <br />certify compliance was mailed with the permit or can be obtained from the Division. (Reference: <br />Regulation No. 3, Part B, II.G.2) <br />2. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does <br />not commence construction /modification or operation of this source within 18 months after either, the date <br />of issuance of this construction permit or the date on which such construction or activity was scheduled to <br />commence as set forth in the permit application associated with this permit; (ii) discontinues construction <br />for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of <br />the estimated completion date. The Division may grant extensions of the deadline per Regulation No. 3, <br />Part B, III.F.4.b. (Reference: Regulation No. 3, Part B, III.F.4.) <br />AIRS ID: 085/0036/003 Page 1 of 12 <br />Version 2011 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.