My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade Rail Spur <br />Site: Hayden Gulch Loadout <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 1/10/2013 <br />User. JLE <br />Permit Action: RN4 <br />State: Colorado <br />County: Routt <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />DRMS <br />Page 1 of 2 <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C081 -002 <br />Basic Machine: Cat D lOT - 10SU <br />Horsepower. 574 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour. $110.73 <br />NA <br />Operating Cost/Hour. $183.36 <br />100 <br />Ripper op. Cost/Hour. $0.00 <br />0 <br />Operator Cost/Hour. $37.41 <br />NA <br />Total unit Cost/Hour. $331.50 1 <br />Total Fleet Cost/Hour. $663.00 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor. <br />Loose volume: <br />80,000 f <br />1.125 <br />90,000 LCY ! <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet 1 <br />Unadjusted hourly production: 1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs/LCY <br />I <br />Weight description: Decomposed rock- 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (_<LXIG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 t (GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.