Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Facilities Area; Office/Parking Lot <br />Site: Hayden Gulch Loadont <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Permit Action: RN4 <br />003 State: Colorado <br />1/10/2013 County: Routt <br />JLE <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />DRMS <br />Page 1 of 2 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -003 <br />Basic Machine: Cat D10T - IOSU <br />Source <br />Horsepower. 574 <br />(AVG.) <br />Blade Type: Semi - Universal <br />(CAT HB)) <br />Attachment: 3 -shank ripper <br />(GEN.) <br />Shift Basis: I per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour. $110.73 <br />NA <br />Operating Cost/Hour: $183.36 <br />( 100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $37.41 <br />NA <br />Total unit Cost/Hour. <br />Total Fleet Cost/Hour: <br />5331.50 <br />5331.50 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,934 <br />Swell factor. 1.125 <br />Loose volume: 4,426 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 1,718.9 LCY /hr <br />Materials consistency description: Compacted fill or embanlanent 0.9 <br />Average push gradient: -5% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />