My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Facilities Area <br />Site: Hayden Gulch Loadout Permit Action: RN4 Petmit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 1/10/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - l0SU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C081 -006 <br />Horsepower. 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost(Hour. $34151 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA <br />Area: 1.60 acres <br />Selected estimating method: Area <br />Bank Volume: NA <br />Rip Depth (ft): 2.50 <br />Source of estimated quantity: PAP Volume II, Tab 12 <br />HOURLY PRODUCTION <br />Seismic: <br />BCY NA <br />Volume: 6,453 BCY or CCY <br />Seismic Velocity: <br />NA <br />Utilization % <br />Ownership Cost/Hour: <br />$110.73 <br />I NA <br />Operating Cost/Hour. <br />$183.36 <br />100 <br />Ripper Operating Cost/Hour: <br />$10.01 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total Unit Cost/Hour: <br />$341.51 <br />feet <br />Total Fleet Cost(Hour. $34151 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA <br />Area: 1.60 acres <br />Selected estimating method: Area <br />Bank Volume: NA <br />Rip Depth (ft): 2.50 <br />Source of estimated quantity: PAP Volume II, Tab 12 <br />HOURLY PRODUCTION <br />Seismic: <br />BCY NA <br />Volume: 6,453 BCY or CCY <br />Seismic Velocity: <br />NA <br />feettsecond <br />Area: <br />Average Ripping Depth: <br />2.87 <br />mph <br />Average Ripping Width: <br />8.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.947 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.947 <br />Acres/hr <br />Site Altitude: <br />6,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency. <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $4343,93 Per acre <br />0.79 Acres/hr <br />0.79 Acres/hr <br />Total job time: <br />2.04 Hours <br />Total job cost: $695.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.