Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Sediment from Ponds Once During Liability Period <br />Site: Hayden Gulch Loadout Permit Action: RN4 Permit/Job #: C 1992081 <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado <br />Date: 1 /10 /2013 County: Routt <br />User: JLE <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Abbreviation: None <br />Filename: C081 -040 <br />Shift basis: 1 per day <br />Equipment Descri lion <br />Truck Loader Team - Truck: Generic 8 -10 cy, 6x4 <br />- Loader: I Cat 336D L 10'-6" Stick <br />Support Equipment -Load Area: I NA <br />-Dump Area: ? NA <br />Road Maintenance —Motor Grader: ( NA <br />-Water Truck: NA <br />I' . + Q, e.,r,a,,..,,. r--V /i ­A_ Team Rnnnnrt Fnivinment Maintenance Equipment <br />Total work team cost/hour. $511.10 <br />MATERIAL OUANTITIES <br />Initial volume: 1,874 CCY Swell factor. 1.135 <br />Loose volume: 2,127 LCY <br />Source of estimated volume. Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />Material Purchase Cost•. $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description: Earth - Wet excavated <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.10 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />; NA <br />NA <br />NA <br />Ownership cosAour. <br />$8.92 <br />$42.57 <br />NA <br />{ NA <br />NA <br />NA <br />Operating cost/hour. <br />$50.32 <br />$79.15 <br />NA <br />NA <br />j NA <br />NA <br />Ripper op. cost'hour. <br />NA <br />$0.00 <br />NA <br />NA <br />i NA <br />NA <br />Operator cost/hour. <br />$0.00 <br />$33.94 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$59.24 <br />$155.66 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />1 1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />I Work: $511.10 <br />Support: $0.00 <br />Maint-. $0.00 <br />Total work team cost/hour. $511.10 <br />MATERIAL OUANTITIES <br />Initial volume: 1,874 CCY Swell factor. 1.135 <br />Loose volume: 2,127 LCY <br />Source of estimated volume. Division of Reclamation, Mining & Safety <br />Source of estimated swell factor. Cat Handbook <br />Material Purchase Cost•. $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description: Earth - Wet excavated <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.10 LCY <br />CIRCES Cost Estimating Software <br />