My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:08 PM
Creation date
1/30/2014 8:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 040 Page 3 of 3 <br />ufl,n 0.,11tP- <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %} <br />Roll. Res <br />( %) <br />Total Res <br />M) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />3.843 <br />Haul Time: 3.843 minutes <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.01 Hours <br />Unit cost: $1.684 /LCY Total job cost: $3,581.37 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res Total Res <br />M) ( (%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />1 <br />10560.00 <br />0.00 <br />3.00 3.00 <br />2874 <br />1 3.703 <br />60.95 LCY/Hour Adjusted for job efficiency: <br />50.59 LCY/Hour <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 303.54 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.01 Hours <br />Unit cost: $1.684 /LCY Total job cost: $3,581.37 <br />CIRCES Cost Estimating Software <br />Return Time: 3.703 <br />minutes <br />Total Truck Cycle Time: 9.588 <br />minutes <br />Loading Tool unit <br />Production <br />470.54 LCY /Hour Adjusted for job efficiency: <br />390.55 LCY /Hour <br />Truck Unit Production <br />60.95 LCY/Hour Adjusted for job efficiency: <br />50.59 LCY/Hour <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 303.54 <br />LCY/Hour <br />Adjusted single tr ick/loader team production: 303.54 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 303.54 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.01 Hours <br />Unit cost: $1.684 /LCY Total job cost: $3,581.37 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.