Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 040 Page 3 of 3 <br />ufl,n 0.,11tP- <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %} <br />Roll. Res <br />( %) <br />Total Res <br />M) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />3.843 <br />Haul Time: 3.843 minutes <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.01 Hours <br />Unit cost: $1.684 /LCY Total job cost: $3,581.37 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res Total Res <br />M) ( (%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />1 <br />10560.00 <br />0.00 <br />3.00 3.00 <br />2874 <br />1 3.703 <br />60.95 LCY/Hour Adjusted for job efficiency: <br />50.59 LCY/Hour <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 303.54 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.01 Hours <br />Unit cost: $1.684 /LCY Total job cost: $3,581.37 <br />CIRCES Cost Estimating Software <br />Return Time: 3.703 <br />minutes <br />Total Truck Cycle Time: 9.588 <br />minutes <br />Loading Tool unit <br />Production <br />470.54 LCY /Hour Adjusted for job efficiency: <br />390.55 LCY /Hour <br />Truck Unit Production <br />60.95 LCY/Hour Adjusted for job efficiency: <br />50.59 LCY/Hour <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 303.54 <br />LCY/Hour <br />Adjusted single tr ick/loader team production: 303.54 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 303.54 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.01 Hours <br />Unit cost: $1.684 /LCY Total job cost: $3,581.37 <br />CIRCES Cost Estimating Software <br />