Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile C to TARR Stations 92 to 144 <br />Site: _ Hayden Gulch Loadout Permit Action: RN4 Permit/Jobr: C1992081 <br />PROJECT IDENTIFICATION <br />Task;*: _5_05 __ State: Colorado <br />Date: I11012013 County: Routt <br />User: JLE <br />Agency or organization name: <br />DR1VIS <br />Abbreviation: None <br />Filename: C081 -505 <br />HOURLY EQUIPMENT COSTShift basis: I per day <br />Equipment Description <br />- Scraper: Cat 637G w.`push -pull <br />- Dozer: NA � - -- -- - - - -- - - - - -- <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10.000 Gal. <br />Cost Break-down- S ,-rnnpr Wrnrl -Ta. Z,,- ,— <br />-- — <br />Scraper <br />Dozer Load Area <br />r Dump Area Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA NA <br />NA 25 <br />I 25 <br />Ownership cosbhour: <br />$100.38 <br />I NA NA <br />I NA $37.98 <br />$52.97 <br />_ Operating cost/hour: <br />$235.35 <br />NA NA <br />NA $16.94 <br />$29.77 <br />Ripper op. cosvllour. <br />NA <br />j NA NA <br />NA 50.00 <br />$0.00 <br />Operator cost/hour: <br />$30.02 <br />NA NA <br />NA i $27.55 <br />$21.17 ; <br />Unit Subtotals: <br />$365.75 <br />NA NA <br />NA $82.46 <br />$103.91 <br />Number of Units: <br />4 <br />" 0 0 <br />0 I <br />1 <br />Group Subtotals: <br />UVork: <br />$1.463.00 Support: <br />$0.00 Maint: <br />$186.37 <br />Total work team cost/hour.. $1.649.37 <br />MATERIAL OUAINTITIES <br />Initial volume: 41,113 CCY Swell factor. 1.000 <br />Loose volume: 41,113 LCY <br />Source of estimated volume: Seneca II -W Permit Table-1 1-3 <br />Source of estimated swell factor. Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />lbsiLCY <br />Material description: <br />__2,100 <br />Earth - Loam <br />Rated Payload: <br />_81.000 bounds <br />Payload Capacity: <br />38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Soffivare <br />