My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081 (22)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:09 PM
Creation date
1/30/2014 8:45:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
TAB 19 TOPSOIL HANDLING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 19 -3 <br />SUITABLE SOIL SALVAGE, STORAGE AND REPLACEMENT <br />Map Unit Designation' <br />Soil Salvage <br />Symbol <br />Name <br />Area <br />(acres) <br />Thickness <br />(feet) <br />Volume <br />(ac -ft) <br />Loadout Facili /Rail Loo <br />5AI <br />Unnamed silty clay loam <br />1.1 <br />2.0 <br />2.2 <br />7C <br />Marapos silty clay loam <br />7.8 <br />0.75 <br />6.1 <br />10C <br />Buckley clay loam <br />1.8 <br />0.5 <br />0.9 <br />DLT <br />Disturbed Land, Topsoiled <br />43.1 <br />0.5 <br />21.5 <br />DLNT <br />Disturbed Land, Not Topsoiled <br />43.3 <br />0.0 <br />0.0 <br />Subtotals <br />97.1 <br />30.7 (34.2) <br />TAHR <br />7B <br />Morapos clay loam 5 -10% slope <br />-- <br />1.0 <br />-- <br />7C <br />Morapos clay loam 10 -15% slope <br />-- <br />1.0 <br />-- <br />lOB <br />Buckley clay 5 -10% slope <br />-- <br />1.0 <br />-- <br />IOC <br />Buckley clay 10 -15% slope <br />-- <br />1.0 <br />-- <br />Subtotals <br />96.6 <br />73.1 <br />Total 1193.7 <br />107.3 <br />Note: <br />1 - Soil Map units are identified on Exhibits 9 -1 and 9 -2 <br />2 - Inplace topsoil volume - in the stockpile the volume is swelled by 13% (32.4 ac -ft) <br />3 - Volume was calculated from stockpile surveys <br />*The facilities area has topsoil available to replace 6 to 9 inches over the area. The TAHR has <br />topsoil available to replace 9 inches. <br />TOPSOIL VOLUME BY STOCKPILE <br />Loadout Facility/Rail Loop <br />Stockpile #1 0.0 ac -ft (removed during facilities area reclamation) <br />Stockpile #2 21.1 ac -ft (6.4 ac -ft removed during facilities area reclamation) <br />Stockpile #3 5.1 ac -ft <br />26.2 ac -ft Remaining <br />I1►_3:1.7 <br />Stockpile A <br />Stockpile C <br />Stockpile D <br />Stockpile E <br />Stockpile F <br />Stockpile G <br />24.4 ac -ft <br />24.4 ac -ft <br />6.0 ac -ft <br />10.4 ac -ft <br />4.6 ac -ft <br />3.3 ac -ft <br />73.1 ac -ft Remaining <br />TR -10 5 revised 02/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.