Laserfiche WebLink
The Tie - Across Haul Road (TAHR) was originally included in Permit C- 1982 -057 (Seneca <br />II -W Mine). The acreage (96.6 acres) is separated from the backfill and grading schedule <br />and the reclamation schedule because of the current uncertain fate of the road, due in part to <br />potential future mining in western Routt County that could require the use of this road; in <br />addition Routt County has expressed interest in retaining the road as a future county road. <br />The road is currently approved to remain inplace until year 2030. <br />The future operations /reclamation plans for the Hayden Gulch Loadout permit area during <br />the next five year permit term are based on future economic considerations which can't be <br />predicted at this time. <br />Cessation of Operations <br />In the event a cessation of operations is to occur for a period of 30 days or more, or as soon <br />as it is known that a temporary cessation will extend beyond 30 days, the CDRMS will be <br />notified. Within 90 days after notification, a notice of intention to cease temporarily or <br />abandon operations will be submitted to the CDRMS defining the information required in <br />Rules 4.30.1 and 4.30.2 as applicable. <br />TR -10 4 Revised 02/13 <br />