My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-17_PERMIT FILE - C1992081A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2013-12-17_PERMIT FILE - C1992081A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:28:58 AM
Creation date
1/30/2014 7:53:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/17/2013
Section_Exhibit Name
Tab 01 Permit Summary
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+L.,.+ +I_ '1 1 ,a r plan ];.11;1 i- T (nri ,nal nr�aratinn and the nn_thP- Qrntlnc] nonditinn) is <br />Liia< ui%. railcar L Uau L Fxc l aauviii�J \ g.� Y <br />$946,090. Consequently, there are reclamation bonds in place for either operational plan. <br />Because of the inactivity at the facility and uncertainty with regards to the future use (i.e., <br />railcar loadout, railcar load -in or both), HGTI reaffirmed with CDMG that the Hayden Gulch <br />Loadout permit was in temporary cessation in correspondence dated August 30, 2005. <br />HGL has since gone into reclamation mode and has removed the surface facilities associated <br />with the coal handling operations and backfilled and regraded the area. On February 2, 2012 <br />HGL submitted a partial phase I bond release application for an 11.9 acre portion of the total <br />202.1 acre disturbed area where the loadout facilities were located. The decision to approve <br />was issued on July 27, 2012 and reduced the reclamation bond liability to $1,203,940. <br />Since CDMGs approval of the original permit application (Permit C -92 -081) in May 1993, <br />Hayden Gulch has submitted several technical revisions (TR), minor revisions (MR), permit <br />renewals (RN) and a bond release (SL). A brief summary of the revisions follows. <br />TR -01 Responses to Stipulations 2 and 3 attached to Permit C -92 -081. The TR was <br />submitted July 22, 1993 and the proposed decision to approve was issued on <br />April 27, 1994. <br />MR -01 Change of Operator and Update TAB 3, Adjudication File. The MR was <br />submitted July 25, 1994 and the proposed decision to approve was issued on <br />August 22, 1994. <br />MR -02 Removal of RRC -15 from permit. The MR was submitted February 27, 1995 <br />and the proposed decision to approve was issued on March 6, 1995. <br />MR -03 Ownership and Control Update. The MR was submitted November 7, 1995 <br />and the proposed decision to approve was issued on December 11, 1995. <br />TR -02 Responses to 1995 Midterm Issues. The TR was submitted January 31, 1996 <br />and the decision to approve was issued on December 19, 1996. <br />MR -04 Submittal of Midterm Bond Increase. The MR was submitted and the decision <br />to approve was issued on April 5, 1996. <br />TR -10 6 Revised 02113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.