My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-21_REVISION - M1999058 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999058
>
2014-01-21_REVISION - M1999058 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:58 PM
Creation date
1/29/2014 3:19:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
Revision
Doc Date
1/21/2014
Doc Name
Technical revision 03
From
Lewicki and Assoc
To
DRMS
Type & Sequence
TR3
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In April of 2012, an additional disturbance of 0.16 acres was added to allow for Portal 45, its access road <br />and associated drainage controls. There was no change to the permit boundary for this Technical <br />Revision #2. The total disturbed area after approval of this revision was 3.93 acres. <br />In January of 2013, another technical revision ( #2) was submitted an additional disturbance of 0.11 acres <br />was added to allow for Portal #6, its access road and associated drainage controls. There was no change <br />to the permit boundary for this Technical Revision. This revision was suspended due to uncertainty over <br />reclamation of the portals. After time to review portal reclamation options, the adequacy response <br />submitted in December 2013 addresses the portal reclamation and entails additional changes. It is <br />proposing to alter the permit boundary without changing the overall acreage based on new accurate <br />mapping of the permit area conducted in October of 2013. Also, a complete review of the portal sealing <br />has occurred and the cost for this sealing has greatly increased. The new reclamation bond is proposed <br />to be $380,671. Also, an additional portal is proposed (Portal #7). <br />Yule Marble Quarry 2014 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.