Laserfiche WebLink
In April of 2012, an additional disturbance of 0.16 acres was added to allow for Portal 45, its access road <br />and associated drainage controls. There was no change to the permit boundary for this Technical <br />Revision #2. The total disturbed area after approval of this revision was 3.93 acres. <br />In January of 2013, another technical revision ( #2) was submitted an additional disturbance of 0.11 acres <br />was added to allow for Portal #6, its access road and associated drainage controls. There was no change <br />to the permit boundary for this Technical Revision. This revision was suspended due to uncertainty over <br />reclamation of the portals. After time to review portal reclamation options, the adequacy response <br />submitted in December 2013 addresses the portal reclamation and entails additional changes. It is <br />proposing to alter the permit boundary without changing the overall acreage based on new accurate <br />mapping of the permit area conducted in October of 2013. Also, a complete review of the portal sealing <br />has occurred and the cost for this sealing has greatly increased. The new reclamation bond is proposed <br />to be $380,671. Also, an additional portal is proposed (Portal #7). <br />Yule Marble Quarry 2014 4 <br />