Topsoil Management <br />The topsoil in the affected area is thin to non - existent and found in small pockets on the generally rocky <br />landscape. Topsoil that is saved will be stockpiled in areas immediately adjacent to the anticipated final <br />limits of the marble block waste piles, to be used subsequently for reclamation. Areas designated for <br />topsoil are the benches created from stacking the marble blocks in the retaining wall. No topsoil <br />stockpiles are anticipated at this time. Should it be found that mining activity sequencing allows or <br />requires short term stockpiling; such topsoil piles will be placed to avoid contamination with rock or <br />other materials, out of traffic areas, and not in areas where the material would be lost to erosion. Salvage <br />of this resource will be done where feasible, but very little topsoil is expected to be possible to salvage. <br />5. Facilities <br />The mine facilities to be used at the Yule Quarry consist of the following: <br />1. Generator trailer <br />2. Propane heater <br />3. Propane tank <br />4. Water dry out sump. <br />5. Diesel tank of 10,000 gallon capacity with lined secondary containment capable of holding <br />110% of the maximum tank volume <br />6. 2 Ventilation fans <br />7. Mine office at yard area in town <br />The majority of the mine's mobile equipment remains underground. Some parking of trucks, etc. does <br />occur where the mine road meets the lower road. <br />Yule Quarry January 2014 43 <br />