Laserfiche WebLink
I, Greg Lewicki, PE, have personally examined the mine and the location of the new Portals #5, #6 and <br />#7 and I certify that the stipulations stated above will make the portals safe, under the condition that as <br />the portal is developed, rock bolts or other measures will be installed, if needed, to provide a safe roof at <br />the portal for any special conditions that may be encountered. <br />Greg Lewicki CO PE 20335 <br />/ / ? ,2o1 <br />Date <br />Mine structures are described in the Mine Plan section of this application. <br />Yule Quarry January 2014 22 <br />1 <br />