Laserfiche WebLink
Table 3 <br />Martin Marietta Materials <br />Duckworth Pit and Del Camino Batch Plant <br />2013 -2014 Combined Total Lagged Depletions and Replacements <br />Duckworth Pit II Del Camino Water Use II Rural Ditch II Renlacemcntg <br />Notes: <br />(1) Equal to Column 13 of Table 1 <br />(2) Del Camino concrete production numbers based on projections provided by MMM. <br />(3) Concrete production water use based on the tons of concrete production projected by MMM. it was assumed that 1 ton of concrete requires approximately 32 gallons of fully consumable water for concrete production. <br />(4) Plant wash out and dust supression water use based on tons of concrete projected by MMM. It was assumed that 18 gallons of fully consumable water would be used for washing and dust control purposes for <br />every ton of concrete produced <br />(5) Equal to (3) + (4) <br />(6) Return flow obligations for deliveries of Rural Ditch shares to Heaton Reservoir in 2013 a total of 14 ac -ft of Rural Ditch water was deliverd to Heaton Reservoir. <br />(7) Historic consumptive use credits associated with MMM's two Rural Ditch shares These values represent the average monthly HCU volumes based on the November 12, 2010 report completed ny Bishop- Brogden <br />Associates These credits are avaialble for storage in Heaton Reservoir or to be bypassed at the proposed Rural Ditch Headgate to replace depletions. <br />(8) Water pumped from water stored in-priority in order to replace depletions at the Duckworth Pit and Del Camino Batch Plant <br />(9) Excess augmentation credits from the South Platte Combined SWSP exchanged up to the point of the Duckworth depletions on Boulder Creek per approval of the water commissioner <br />(10) Credit from dewatenng is based upon Table 2. <br />(11) Equal to (8) + (9) + (10) <br />(12) Equal to (11) +(1) +(5) +(6) <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />(8) <br />(9) <br />(10) <br />(11) <br />(12) <br />Water Pumped <br />Excess Credit <br />Dust <br />Rural Ditch <br />from Heaton <br />from South <br />Credit from De <br />Del Camino <br />Concrete <br />Supression and <br />Rural Ditch <br />Historic <br />Reservoir to <br />Platte <br />Watering <br />Total lagged <br />Concrete <br />Production <br />Washing <br />Total Plant <br />Return Flow <br />Consumptive <br />Replace <br />Combined <br />Operations at <br />Total <br />Net Effect to the <br />Depletions <br />Production <br />Water Use <br />Water Use <br />Water Use <br />Obligations <br />Use Credit <br />Depletions <br />SWSP <br />Duckworth <br />Replacements <br />River <br />(ac -ft) <br />(tons) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />Nov -13 <br />-032 <br />0 <br />0.00 <br />000 <br />000 <br />-022 <br />000 <br />0.55 <br />0.00 <br />000 <br />055 <br />0.00 <br />Dec -13 <br />-0.37 <br />0 <br />000 <br />000 <br />000 <br />-0 15 <br />000 <br />0:53 <br />0.00 <br />000 <br />053 <br />0.00 <br />Jan -14 <br />-039 <br />0 <br />000 <br />000 <br />000 <br />-0 11 <br />000 <br />0.50 <br />0.00 <br />000 <br />050 <br />0.00 <br />Feb -14 <br />-0.40 <br />0 <br />000 <br />000 <br />0.00 <br />-0 18 <br />000 <br />0.58 <br />0.00 <br />000 <br />0.58 <br />0.00 <br />Mar -14 <br />-040 <br />0 <br />000 <br />000 <br />0.00 <br />-0.14 <br />000 <br />0.54 <br />0.00 <br />000 <br />054 <br />0.00 <br />Apr -14 <br />-0.40 <br />5,500 <br />-0.54 <br />-0.30 <br />-0 84 <br />-006 <br />0.00 <br />1.30 <br />0.00 <br />0.00 <br />1.30 <br />0.00 <br />May -14 <br />-042 <br />5,500 <br />-0.54 <br />-030 <br />0 84 <br />000 <br />13 50 <br />1.26 <br />0.00 <br />000 <br />1 26 <br />0.00 <br />Jun -14 <br />-046 <br />5,500 <br />-0.54 <br />-030 <br />-0.84 <br />0.00 <br />2730 <br />1.30 <br />0.00 <br />000 <br />1 30 <br />0.00 <br />Jul -14 <br />-0.51 <br />5,500 <br />-0.54 <br />-030 <br />-0.84 <br />0.00 <br />34.30 <br />1.35 <br />0.00 <br />000 <br />1.35 <br />0.00 <br />Aug -14 <br />-0.56 <br />5,500 <br />-0.54 <br />-0 30 <br />-0 84 <br />000 <br />19 10 <br />1.41 <br />0.00 <br />0.00 <br />1.41 <br />0.00 <br />Sep -14 <br />-0.62 <br />5,500 <br />-0.54 <br />-0.30 <br />-0 84 <br />000 <br />6.60 <br />1.47 <br />0.00 <br />000 <br />147 <br />0.00 <br />Oct -14 <br />-0.68 <br />5,500 <br />-0.54 <br />-0.30 <br />-0 84 <br />-006 <br />0.00 <br />1.58 <br />0.00 <br />000 <br />1.58 <br />0.00 <br />Annual Total <br />-5 53 <br />38,500 <br />-3 78 <br />-2.13 <br />5 91 <br />0 93 <br />100.80 <br />12.37 <br />000 1 <br />000 1 <br />12 37 <br />0.00 <br />Notes: <br />(1) Equal to Column 13 of Table 1 <br />(2) Del Camino concrete production numbers based on projections provided by MMM. <br />(3) Concrete production water use based on the tons of concrete production projected by MMM. it was assumed that 1 ton of concrete requires approximately 32 gallons of fully consumable water for concrete production. <br />(4) Plant wash out and dust supression water use based on tons of concrete projected by MMM. It was assumed that 18 gallons of fully consumable water would be used for washing and dust control purposes for <br />every ton of concrete produced <br />(5) Equal to (3) + (4) <br />(6) Return flow obligations for deliveries of Rural Ditch shares to Heaton Reservoir in 2013 a total of 14 ac -ft of Rural Ditch water was deliverd to Heaton Reservoir. <br />(7) Historic consumptive use credits associated with MMM's two Rural Ditch shares These values represent the average monthly HCU volumes based on the November 12, 2010 report completed ny Bishop- Brogden <br />Associates These credits are avaialble for storage in Heaton Reservoir or to be bypassed at the proposed Rural Ditch Headgate to replace depletions. <br />(8) Water pumped from water stored in-priority in order to replace depletions at the Duckworth Pit and Del Camino Batch Plant <br />(9) Excess augmentation credits from the South Platte Combined SWSP exchanged up to the point of the Duckworth depletions on Boulder Creek per approval of the water commissioner <br />(10) Credit from dewatenng is based upon Table 2. <br />(11) Equal to (8) + (9) + (10) <br />(12) Equal to (11) +(1) +(5) +(6) <br />