My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-08_REVISION - M1994096
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994096
>
2014-01-08_REVISION - M1994096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:48 PM
Creation date
1/28/2014 9:48:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994096
IBM Index Class Name
REVISION
Doc Date
1/8/2014
Doc Name
Application for Transfer of Mineral Permit and Succession of Operators
From
High Plains Sand and Gravel to Glacier Rock Company
To
DRMS
Email Name
ECS
TAK
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />Other Reclamation Permits held by Prospective Successor (if applicable): <br />NA <br />DESIGNATION OF REVIEW TIMELINE <br />As explained above, the Permittee and Prospective Successor may waive their right to receive a <br />decision on an Application within 30 days in order to allow the Division to calculate the required <br />Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br />one of the following two options to designate their choice. If Permittee and Prospective <br />Successor cannot agree, the Division will render its decision within 30 days. <br />The Prospective Successor must provide an adequate Financial Warranty or conditional <br />replacement Financial Warranty, consistent with the designation above. Hard Rock and <br />Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br />Each Financial Warranty must be submitted on the Board's approved forms (available online at <br />http: / /mining. state .co.us /Mineral %20Forms.htm). <br />I have reviewed the information provided in this Application <br />Permittee <br />Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br />Prospective Successor <br />MY APPLICATION WITHIN 30 DAYS. <br />I have reviewed the information provided in this Application <br />Permittee <br />Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br />Pro^s�n► cti'' e acessor <br />ON MY APPLICATION WITHIN 30 DAYS. <br />The Prospective Successor must provide an adequate Financial Warranty or conditional <br />replacement Financial Warranty, consistent with the designation above. Hard Rock and <br />Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br />Each Financial Warranty must be submitted on the Board's approved forms (available online at <br />http: / /mining. state .co.us /Mineral %20Forms.htm). <br />
The URL can be used to link to this page
Your browser does not support the video tag.