Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />January 27, 2014 <br />William A. Bear <br />Bowie Resources, LLC <br />P.O. Box 483 <br />Paonia, CO 81428 <br />Re: Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Minor Revision No. 146 (MR- 146) <br />Acreage Corrections and Pitkin Mesa Pipeline Replacement <br />Second Adequacy Review <br />Dear Mr. Bear: <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has completed a second adequacy review of the minor revision application (MR -146) <br />submitted by Bowie Resources, LLC (BRL) for the Bowie No. 2 Mine. The revision proposes a reclamation <br />plan and cost estimate for replacement of a section of the Pitkin Mesa Pipeline over Panels 15 and 16, <br />and corrects the disturbed and affected area acreage within the permit area. We have the following <br />comments regarding the application. <br />1. The Division will place the following stipulation, regarding topsoil handling, on the approval of MR- <br />146. <br />"Prior to removal of topsoil along the Pitkin Mesa pipeline, all snow in the topsoil <br />removal area shall be removed. Topsoil may not be removed if ground conditions are <br />wet or snowy. Photographic documentation of conditions at topsoil removal shall be <br />recorded and submitted to the Division." <br />2. The Division will place the following stipulation, regarding excavation through Stevens Gulch Road, <br />on the approval of MR -146: <br />"Prior to excavation through Stevens Gulch Road, Bowie Resources, LLC must submit, to <br />the Division, documentation of Delta County's acknowledgement of the excavation <br />activities within the roadway." <br />3. The Division will place the following stipulation, regarding subsidence monitoring, on the approval of <br />MR-146: <br />"Prior to any Pitkin Mesa Pipeline replacement disturbance, Bowie Resources, LLC (BRL) <br />must determine which subsidence monuments located over the replaced pipeline <br />segment will be disturbed. Any monuments that will be disturbed by the pipeline <br />replacement must be surveyed prior to removal, reset, and surveyed again, with the <br />reset positions calibrated relative to the original locations. No undermining of the <br />pipeline may occur until the monuments are in place and surveyed. BRL must include <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />