My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-27_REPORT - C1981018
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2014-01-27_REPORT - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:17 PM
Creation date
1/27/2014 10:25:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
1/27/2014
Doc Name
4th Quarter 2013 Wastebank Report
From
Blue Mountain Energy
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r DESERADO MINE <br />BLUE MOUNTAIN ENERGY <br />3607 County Rd. 65 <br />Rangely, CO 81648 <br />(970)675 -4300 <br />fax (970)675 -4399 <br />January 20, 2014 RECEIVED <br />Mr. Zach Trujillo JAN 2 7 2014 <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 DIVISION OF RECLAMATION <br />Denver, CO 80203 MINING AND SAFETY <br />RE: Professional Certification for the Coal Processing Waste Banks <br />Deserado Mine - Permit No. C- 1981 -018 <br />Dear Zach: <br />During the fourth quarter of 2013, qualified persons working under my direction and I conducted <br />a series of compliance inspections on the active coal processing waste banks located within the <br />Deserado permit area. These inspections were conducted roughly on a bi- weekly basis. <br />I am a professional engineer registered in the State of Colorado and my experience fulfills the <br />requirements of the Colorado Surface Coal Mining Reclamation Act. <br />The purpose of these inspections and subsequent certification is to ensure proper construction of <br />the refuse piles and to satisfy the requirements of Rule 4.10.2 of the Colorado Mined Land <br />Reclamation Board. <br />INSPECTION OF ACTIVE AREAS 2 -3 -4 and 5A <br />There are no apparent points of seepage, or indications of slope failure on the active piles. The <br />surface drainage facilities were adequately maintained and were working properly to convey <br />surface runoff. Sediment control structures need periodic maintenance and are cleaned out as <br />conditions warrant. <br />The following maintenance work was completed since the last quarterly report: <br />1. Refuse was placed, spread, and compacted on Areas 2 -3 -4 and 5A. <br />2. Seasonal stockpiling began and will continue until conditions allow proper placement <br />and compaction. <br />Our permit requires no sub -drain system, as geotechnical investigations for the disposal site <br />revealed no groundwater present. <br />Refuse is spread and compacted in lifts not exceeding 24" in depth. Typically refuse is spread <br />much thinner producing 6" to 8" lifts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.