Laserfiche WebLink
Page 7 of 7 <br />Daisy, Englemann's <br />1.00 <br />4.94 <br />$104.61 <br />Prairie Junegrass <br />2.00 <br />106.31 <br />$68.80 <br />Golden Banner <br />1.00 <br />2.00 <br />$87.57 <br />Totals Seed Mix <br />21.00 <br />236.80 <br />$384.35 <br />Application <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Cost /Acre <br />—Description <br />Drill seeding (DRMS Cost Data) <br />$88.20 <br />Total Seed Application Cost /Acre <br />$88.20 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Hay, delivered {MEANS 3125 14.16 12001 <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost/Acre <br />Cost /Acre <br />$530.00 <br />Application <br />NURSERY STOCK PLANTING <br />Cost /Acre <br />—Description <br />with tractor {DMG survey data{ <br />$65.89 <br />—Crimping, <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$86.68 <br />Total Mulch Application Cost /Acre <br />$152.57 <br />NURSERY STOCK PLANTING <br />JOB TIME AND COST <br />No. of Acres: 2 Cost /Acre: $1,155.12 <br />Estimated Failure Rate: 50% Cost /Acre *: $472.55 <br />*Selected Replanting Work Items: SEEDING <br />Initial Job Cost: $2,310.24 <br />Reseeding Job Cost: $472.55 <br />Total Job Cost: $2,782.79 <br />Job Hours: 4 <br />No <br />Common Name <br />P1 g <br />Fertilizer <br />Cost /Acre <br />Type and Size <br />Pellet <br />Acr <br />Cost <br />Cost <br />e <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />JOB TIME AND COST <br />No. of Acres: 2 Cost /Acre: $1,155.12 <br />Estimated Failure Rate: 50% Cost /Acre *: $472.55 <br />*Selected Replanting Work Items: SEEDING <br />Initial Job Cost: $2,310.24 <br />Reseeding Job Cost: $472.55 <br />Total Job Cost: $2,782.79 <br />Job Hours: 4 <br />