My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-24_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-01-24_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:14 PM
Creation date
1/24/2014 12:58:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/24/2014
Doc Name
Letter & Application
From
J.E Stover & Associates, Inc
To
DRMS
Type & Sequence
MR146
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />January 23, 2014 <br />Susan Burgmaier + rlet) <br />Division of Reclamation, Mining & Safety 201 <br />1313 Sherman St., Room 215 ,AN <br />Denver, CO 80203 pNISIpN pF RECLAMATION <br />MINING ANC SAFETY <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -146, Pitkin Mesa Pipeline <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />On behalf of Bowie Resources, LLC, BRL, enclosed is an application for a minor revision <br />to allow for the replacement of a section of the Pitkin Mesa pipeline that overlies <br />longwall panels B -15 and B -16. <br />Project Description <br />BRL plans to install 4,300 feet of 6 inch diameter schedule 80 HDPE pipe adjacent to <br />the existing Pitkin Mesa pipeline. The new pipe will be placed in a trench excavated <br />next to the existing pipeline. The new pipe installed by BRL will replace the existing <br />pipeline. The existing pipeline will be capped and remain in place. BRL will backfill the <br />pipeline, replace topsoil and seed the disturbed area as the pipeline is installed. <br />Right of Entry <br />Work will be performed within the Pitkin Mesa pipeline easement. <br />Affected and Disturbed Area <br />There will be 2 acres of new disturbance. The affected area will increase 0.2 acres <br />because about 500 feet of the pipeline are located outside of the affected area <br />boundary. <br />There was some overlap in the disturbed area calculated for MR -132 (6.1 ac), TR -72 <br />(1.8 ac) and TR -75 (6.6) a total of 14.5 acres. The primary overlap occurred between <br />MR -132 and TR -75. It is calculated the total disturbed area for these three permit <br />actions is 8.7 acres. This results in a 5.8 acre reduction in the total affected and <br />disturbed area. The net result is a 5.6 (5.8 - 0.2) acre reduction in the affected area <br />and a 3.8 (5.8 - 2.0) acre reduction in the disturbed area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.