Laserfiche WebLink
Gob Pile #3 <br />Underdrain Installation <br />Triangle section at <br />seep <br />q <br />Installed <br />12/19/2013 & <br />1/3/2014 <br />Photos taken at the seep location. A 2' <br />deep triangle section was dug out, pipe <br />placed, and gravel was placed around <br />the pipes. <br />A 2' section of gravel was brought up the <br />slope face and wrapped with geotextile <br />fabric. Fabric wrapped gravel then had <br />native material placed against it. The <br />native material was compacted every 2' as <br />it was brought up. <br />• <br />r <br />� xj <br />. <br />f <br />y <br />x <br />Installed <br />12/19/2013 & <br />1/3/2014 <br />Photos taken at the seep location. A 2' <br />deep triangle section was dug out, pipe <br />placed, and gravel was placed around <br />the pipes. <br />A 2' section of gravel was brought up the <br />slope face and wrapped with geotextile <br />fabric. Fabric wrapped gravel then had <br />native material placed against it. The <br />native material was compacted every 2' as <br />it was brought up. <br />