Laserfiche WebLink
Gob Pile #3 <br />Underdrain Installation <br />First section, 0 -100 Feet, <br />Installed 11/11/13 <br />Installed 11/11/2013 <br />�. .. <br />.t <br />7..Y .t <br />Work began at the <br />outlet end of the <br />underdrain. The <br />2' trench was <br />dug, measured, <br />then wrapped <br />with a geotextile <br />fabric. Next, pipe <br />was placed in the <br />trench. <br />