My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-24_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-01-24_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:13 PM
Creation date
1/24/2014 10:06:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
1/24/2014
Doc Name
4th Quarter 2013 Wastebank Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In general, the grading and compaction of CWDA No. 2 appears to be progressing well <br />and significant work has been done since our last site visit in September 2013, as <br />indicated by our weekly compaction testing and observation reports. CDWA Pile No. 2 <br />appears to be stable and in good condition for winter storage until processing operations <br />begin again in spring 2014. <br />Closinci <br />On -going monitoring of inclinometers and piezometers at CWDA No. 2 provides an <br />indication of the stability of the refuse as well as an indication of probable performance <br />for other refuse piles at Bowie. For these reasons, we recommend continued monitoring <br />of this instrumentation on a quarterly basis. We sincerely appreciate the opportunity to <br />work with you on this project. If you have any questions regarding this letter or the <br />instrumentation monitoring at CWDA No. 2, please don't hesitate to contact me at (970) <br />497 -8852 or clan @buckhorngeo.com. <br />Sincerely, t �o °; �' %•,�, <br />BUCKHORN GEOTECH INC. ° <br />• 38334 <: <br />e <br />t .��.,•° $� 13.E �, <br />Daniel C. Quigley, P.E. ��� °•••••'���� <br />Enclosures: Instrumentation Site Plan, Inclinometer Cumulative Displacements, Summary of <br />Pore Pressure Monitoring <br />cc: Jim Stover, J.E. Stover and Associates — ELECTRONICALLY ONLY <br />2013-4 1h Quarter Monitoring Report PN #05- 126 -GEO <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.