My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-24_REVISION - X201222311
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X201222311
>
2014-01-24_REVISION - X201222311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:14 PM
Creation date
1/24/2014 10:02:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201222311
IBM Index Class Name
Revision
Doc Date
1/24/2014
Doc Name
Modification to Notice of Intent to Conduct Exploration Drilling
From
Oxbow Mining Oak Mesa, LLC
To
DRMS
Type & Sequence
AM1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />PART II <br />1. Location of Exploration Area, Rule 2.02.2(2)(c): <br />a. County(s): Delta County <br />0 <br />Township <br />Range <br />Section(s) <br />13S <br />93W <br />13,14,24,25,35 6`" PM <br />13S <br />93W <br />9, (lots 9 -16); 10, (lots 9 -16); 11, (lots 9 -16); 12 <br />(lots 9 -16); 15, (lots 1- 10),14,15); 16, (lots 1 -4); 23, <br />(lots 1 -15); 26, (lots 1 -15); 36, (lots 1 -8, 11 -14) <br />13S <br />92W <br />16, 17, 18, 19, 20, 21, 29, 6`" PM <br />13S <br />92W <br />7,(lots 13 -20); 8,(S/2); 9,(S/2); 15,(lots 13,18 19,22); <br />22, (lots 4,5,12,13); 28, (lots 2 -7); 30, (lots 5 -18) <br />Additional north surface area added to modified NOI <br />13S <br />92W <br />6, (Lots 12 -23); 7, (Lots 6 -11) 6t" PM <br />13S <br />93W <br />1, (Lots 18 -20); 12, (Lots 1 -3, 6 -8) 6`" PM <br />c. A map at a scale of 1" = 2000' has been provided which shows the exploration <br />activities involved, including all roads to be used or built and the location of drill sites, if <br />applicable. <br />d. Supply longitude and latitude if the area has not been surveyed. <br />2. Period of Intended Exploration: <br />Exploration site #'s Table 1 below. <br />2 yrs. from BLM approval from (mo. /yr.) 11/2012 into 11/2014 <br />2 yrs. from BLM approval of North Area Application from (mo./yr.) 312014 into 312016 <br />All exploration activities will be completed by (mo. /yr.) 2/2016 (weather permitting) <br />All reclamation activities will be completed by (mo. /yr.) 11/2016 (weather permitting) <br />3. If the surface is owned by a person other than the person who intends to explore, give a <br />description of the basis upon which the person who will explore claims the right to enter such <br />area for the purpose of conducting exploration and reclamation (attach supporting <br />documents, if applicable): <br />3.0 Oxbow's right to enter private surface to explore for Federal coal (Rule 2.02.2(2)(e)) <br />Surface Use Agreements will be obtained with each surface owner of record that overlies <br />the Federal coal within this area. Surface access will not be attempted until a surface use <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.