My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/24/2014 9:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results Phase 5 Slide Repair
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LZ It <br />Cripple Creek & Victor Gold Mining Company <br />Mill Site Earthworks <br />Photograph Log <br />Photo <br />Number <br />Date <br />Description <br />1 <br />September 11, 2013 <br />Exposing the liner at the anchor trench <br />2 <br />September 17, 2013 <br />Removing DCF from the damaged liner prior to geomembrane removal <br />3 <br />September 19, 2013 <br />Removing DCF from the damaged liner prior to geomembrane removal <br />4 <br />Se tember 19, 2013 <br />Removing DCF from the damaged liner prior to geomembrane removal <br />5 <br />September 23, 2013 <br />Removing DCF from the damaged liner prior to geomembrane removal <br />6 <br />October 8, 2013 <br />Removing the damaged existing liner <br />7 <br />October 9, 2013 <br />Using a compactor to smooth the subgrade <br />8 <br />October 9, 2013 <br />Deploying the new geomembrane liner <br />9 <br />October 9, 2013 <br />Deploying the new geomembrane liner <br />10 <br />October 10, 2013 <br />Pressure testing a completed fusion seam <br />11 <br />October 10, 2013 <br />Compacting material in the anchor trench <br />12 <br />October 13, 2013 <br />Grinding and extrusion welding the new liner to the existing liner <br />13 <br />October 13, 2013 <br />Vaccuum testing a completed extrusion seam <br />14 <br />October 16, 2013 <br />Extrusion welding a patch <br />15 <br />October 16, 2013 <br />Grinding and labeling patches <br />16 <br />October 16, 2013 <br />Testing samples using a field tensiometer <br />17 <br />October 16, 2013 <br />Fusion seaming a patch <br />18 <br />October 17, 2013 <br />Vaccuum Testing a completed repair <br />19 <br />October 30, 2013 <br />Clearing the road to the base of the Phase 5 Slide <br />20 <br />October 31, 2013 <br />Beginning to place Drain Cover Fill <br />21 <br />November 2, 2013 <br />Placing Drain Cover Fill <br />22 <br />November 4, 2013 <br />Placing Drain Cover Fill <br />23 <br />November 4, 2013 <br />Placing Drain Cover Fill <br />24 <br />November 7, 2013 <br />Placing Drain Cover Fill <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.