Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Phase 5 Slide Repair <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 14, 2014 <br />7.0 CONCLUSIONS <br />In accordance with our responsibilities as the Project Engineer and as the Quality <br />Assurance Consultant for construction of the Phase 5 Slide Repair, and per the <br />requirements of the various applicable DBMS approvals, AMEC attests that it <br />observed and performed the required CQA activities during construction of the Phase <br />5 Slide Repair. Based on daily communications with AMEC personnel; observations <br />made during on -site visits; and review of the laboratory and field test results; AMEC <br />attests that the Phase 5 Slide Repair was constructed in compliance with the design <br />plans and specifications as described in this document. <br />Sincerely, <br />AMEC Environment and Infrastructure, Inc. <br />Thorne M. Clark <br />Project Resident <br />Michael E. Nelson, PE <br />Certifying Engineer / Project Manager <br />alm /ALM <br />sAprojects \1568 cc &v - ph v slide repair cqa \11.0 certification report\cc &v roc report.docx 17 <br />