Laserfiche WebLink
HQ10' <br />PONDS 1 AND 3 ARE RETENTION PONDS, POND 2 RECEIVES WATER <br />PjwPED FROM CR£EA AN^ TREATED WATra PROM WASH PLAN' <br />PONDS A ANO 5 ARE OUTSIDE WORK AREA AND DO NOT RECEIVE <br />SITE STORMWATER OR PROCESS WATER. <br />MATERIALS NANDUNG OCCURS TWOOUC,uOUT itom- G A:�D STOCKPILE <br />AREAS. <br />PROPERTI BOUNDARY <br />SITE icL;m;.;RY <br />'�+'�'�►"��"+��"' AC'IVE MINING AREA <br />"� �• •� _ DRAINAGE BASIN <br />EXTENT OF SOIL DISTURBANCE <br />STOCKPILE AREA <br />q lq 1fC <br />+ -.-h . 500 h. <br />RECEIVED <br />JAN 2 3 2014 <br />Division of Reclamation, <br />Mining & Safety <br />