Laserfiche WebLink
1/23/2014 <br />STATE OF <br />js k ICOLORADO�� <br />State.co.us Eecutive Branch Mail -Re: New Elk Mine <br />Alysha, <br />The official form for the abatement extension is attached. I do not intend to email it to the operator, but they will <br />need a paper copy. <br />Thanks, <br />Leigh <br />On Thu, Jan 23, 2014 at 10:17 AM, Simmons - DNR, Leigh <Ieigh.simmons@state.co.us> wrote: <br />Ron, <br />Per your request the deadline for the abatement of NOV CV -2013 -009 has been extended to February 23, <br />2014. (The NOV was incorrectly referred to as CV- 2013 -008). The new deadline is 90 days from the date the <br />NOV was originally issued. <br />We look forward to the receipt of a Technical Revision application as soon as possible to ensure that the new <br />deadline can be met. <br />Leigh Simmons <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303 866 3587 (8121) <br />On Thu, Jan 23, 2014 at 10:05 AM, Ron Thompson <ronthompson newelkcoal.com> wrote: <br />Leigh, <br />As discussed this morning, attached is a request for 30 -day extension of the abatement period for CV2013- <br />008. <br />Regards <br />https: / /mai l.g oog le.conVmai 1 /u /O / ?ui =2 &i k=e29129fcb5 &view= pt &search =i nboy&th= 143c083e9c4bOfe2 1/2 <br />