My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-08_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2014-01-08_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:47 PM
Creation date
1/22/2014 10:20:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/8/2014
Section_Exhibit Name
Rule 4 Performance Standards -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.02.7 Topsoil Markers <br />Colowyo clearly marks all stockpile topsoil with signs reading "Topsoil." <br />4.03 ROADWAYS <br />The following sections deal with roads defined per Rule 1.04 (111). <br />4.03.1 Haul Roads <br />The construction, location, and maintenance of haul road "A" (4 mile roadway from pit area to Gossard <br />Loadout) and haul road `B" (1.4 mile roadway from Highway 13 to haul road "A ") is discussed in the <br />existing permit document. These roads will continue to be used as part of the South Taylor /Lower Wilson <br />mining area. Refer to the existing permit document for details regarding these haul roads. <br />Due to the nature of the South Taylor Pit Expansion, Colowyo will construct and maintain a haul road that <br />will be located within the Disturbance Boundary but almost entirely outside the active mining boundary. This <br />haul road will reduce the haul length to and from the South Taylor Pit for the overburden haul trucks and the <br />coal haul trucks as well as giving other mining related equipment a more direct route from the main <br />office /shop area to the South Taylor Pit. Access to the South Taylor mining area will be through the existing <br />mining area as well as through this new South Taylor Haul Road. <br />The South Taylor Haul Road will be constructed to meet design and construction criteria set forth in Rule <br />4.03.1(3) and will be certified upon completion by a registered professional engineer. All prudent dust <br />control practices will be followed to comply with Rule 4.17. Please refer to Map 23 — Mine Plan and Map <br />25C for design details regarding this specific haul road. Reclamation of the South Taylor Haul Road to AOC <br />will be addressed as required by Rule 4.03.1(7) and will take place after Colowyo has determined that the <br />road will no longer be needed for operations, reclamation or monitoring and presumably during reclamation <br />of the final pit area. The reclamation timeline is shown on Map 29 — Spoil Grading. Reclamation will <br />include regrading the road embankments and ditches and recontouring the road to the approved AOC as <br />shown on Map 19 — Postmining Topography South Area. The regraded areas will then have topsoil replaced <br />and be reseeded. All of this disturbed runoff will drain to either a sediment pond or an approved SAE, as <br />appropriate. <br />Roads that will be constructed in the actual mining areas will constantly change as the operation progresses. <br />The "in -pit" roads will be maintained by a motor grader and regularly wetted to minimize dust as required by <br />the air quality permit. Any drainage off the "in -pit" roads will be retained in the pit or diverted to the <br />drainage and sediment control structures located on Map 33B and in Exhibit 7, Hydrology. <br />Colowyo will maintain the haul roads throughout the life of the mine with repairs including blading, filling of <br />potholes, and replacement of road surface as necessary. Likewise, watering for dust control will be <br />implemented as necessary. Other information relevant to haul roads is provided in the existing permit. <br />4.03.2 Access Roads <br />Other than the Sturgeon Access Road, there will be no changes to existing access roads for the South Taylor <br />pit expansion. <br />The existing two -track Sturgeon Road will be upgraded to allow access for construction and for routine <br />monitoring and maintenance. Map 25B provides the road design information for Sturgeon Access Road. <br />South Taylor /Lower Wilson — Rule 4, Page 2 Revision Date: 10/31/13 <br />Revision No.: MR -129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.