Laserfiche WebLink
r-lims-1 <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with applicable rules and <br />regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER. <br />* ** END OF SECTION * ** <br />Section 02200 Page 18 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />SAProjects \1125 CCBV Phase 5 VLF \I - Tech Specs\Arequa IFC Specs \02200.rt.doc <br />