My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/21/2014 4:53:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results -Lab Liner Ext
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec,, <br />■ verify that no continuous horizontal seams are placed on slopes unless approved by <br />CERTIFYING ENGINEER; and, <br />■ observe and document that all soil materials placed on top of the geosynthetics are done in <br />such a manner as to ensure that the geosynthetics are not damaged. <br />6.03.01 GEOMEMBRANE: <br />During geomembrane installation, the CQA Monitor shall observe and document deployment, trial seams, <br />field seaming, non - destructive and destructive seam testing, and repairs to assure that the installation is in <br />compliance with the SPECIFICATIONS. <br />Deployment - The CQA Monitor shall verify that only approved materials are used, each panel is <br />given a unique panel number, no geomembrane is placed during unsuitable weather conditions as <br />outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the geomembrane is not <br />damaged during installation, and anchoring is performed in compliance with the <br />SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the deployment on <br />the deployment log form. <br />Trial Seams - The CQA Monitor shall verify that seaming conditions are performed in <br />compliance with SPECIFICATIONS, tests are performed at required intervals, specified test <br />procedures are followed, and retests are performed in compliance with the SPECIFICATIONS. If <br />the ambient air temperature measured by the CQA Monitor is above 35 °F for the entire day, the <br />INSTALLER shall perform trial seams at the beginning of each crew shift, and immediately <br />following any work stoppage (i.e., for lunch, weather conditions, etc.) of 30 minutes or more for <br />each seaming apparatus used that day. If the ambient air temperature measured by the CQA <br />Monitor is below 35 °F for the entire day, the INSTALLER shall perform four (4) trial seams, at <br />approximately the same time interval throughout the scheduled work day. Each Seamer shall <br />make at least one trial seam each day. Seaming operation shall not commence until the CQA <br />Monitor has determined that the seaming process is meeting the SPECIFICATION requirement <br />and is acceptable. The CQA Monitor shall record the trial weld results on the trial seam log form. <br />Field Seaming - The CQA Monitor shall verify that only approved equipment and personnel <br />perform welding, all welding is performed under suitable conditions as specified in the project <br />SPECIFICATIONS, specified overlaps are achieved, seams are oriented in compliance to project <br />requirements, and that grinding techniques and extrudate meet project requirements for extrusion <br />welding. The CQA Monitor shall record all field seaming on field seaming log forms. <br />Non - Destructive Seam Continuity Testing - The CQA Monitor shall verify that all seams and <br />repair are non - destructively tested in compliance with the project SPECIFICATIONS. If a seam <br />cannot be tested, the CQA Monitor shall observe cap strip operations. The CQA Monitor shall <br />verify that test equipment and gauges are functioning properly and that test procedures are in <br />compliance with the project SPECIFICATIONS. The CQA Monitor shall verify that all seams <br />and repairs with failing test results are repaired and/or re- tested until passing results are achieved. <br />The CQA Monitor shall record all non - destructive test locations on the vacuum test and pressure <br />test log forms. <br />Destructive Seam Testing - The INSTALLER shall obtain samples, at locations selected by the <br />CQA Monitor, of the field seamed geomembrane approximately 24 inches along and 12 inches <br />across the seam and centered over the seam as follows: <br />■ a minimum of one sample per day; <br />Section 01400.2 Page 7 of 11 December 6, 2013 <br />Geosynthetic CQA Plan Revision 2 <br />SAProjects \1125M -CC &V Lab Liner Extension \H2 - Design \Lab Liner Extension \Cert Report\Cert 08.06.13V1ppendix D Specifications \Individual Sheets \01400.2 2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.