My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-01-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:03 PM
Creation date
1/21/2014 4:53:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/17/2014
Doc Name
Final Report - Quality Assurance Monitoring & Test Results -Lab Liner Ext
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />• obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br />• observe prepared subgrade prior to geosynthetic deployment; <br />• monitor and document geosynthetic material placement, trial seam testing, non - destructive <br />testing, seaming and repair operations, and destructive testing; <br />• identify seam samples for CQA destructive testing; <br />• assure that testing equipment used, and tests performed are conducted according to project <br />SPECIFICATIONS and industry standards; <br />• perform or observe, document, and report test results to MANAGER as required; <br />• report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />Monitor, including design or project SPECIFICATION changes; and <br />• prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory details, <br />subgrade acceptance forms, test data, tests results (both laboratory and field), QC submittals, <br />geomembrane panel layout as -built prepared by the CQA Monitor, professional certification <br />that construction was completed in compliance with the DRAWINGS and <br />SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />2.06 GEOSYNTHETICS MANUFACTURER: <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER ", is responsible for <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER must verify <br />prior to construction that the MANUFACTURER can produce material that meets the requirements <br />outlined in project SPECIFICATIONS. <br />2.07 GEOSYNTHETICS INSTALLATION CONTRACTOR: <br />The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or "INSTALLER ", <br />is responsible for installation of the geosynthetic components, as outlined in the project <br />SPECIFICATIONS. <br />The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br />The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br />anchoring, seaming, repairs and non - destructive testing, in accordance with the project plans, <br />SPECIFICATIONS and the INSTALLER's internal quality control program. It is the INSTALLER's <br />responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br />2.08 EARTHWORKS CONTRACTOR: <br />The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper delivery and <br />placement of earthwork components as outlined in the project SPECIFICATIONS. <br />PART 3.0 LINES OF COMMUNICATION <br />Section 01400.2 Page 3 of 11 December 6, 2013 <br />Geosynthetic CQA Plan Revision 2 <br />SAProjects \1125M -CC &V Lab Liner Extension \H2 - Design \Lab Liner Extension \Cert Report\Cert 08.06.13VAppendix D Specifications \Individual Sheets \01400.2 2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.