Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Laboratory Liner Extension <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 14, 2014 <br />LIST OF APPENDICES <br />Appendix A Record of Construction Drawings <br />Appendix B Photographic Documentation <br />Appendix B.1 Photograph Log <br />Appendix B.2 Construction Photographs <br />Appendix C Schedule of AMEC Field Personnel <br />Appendix D Specifications <br />Appendix E Concrete CQA Laboratory Test Results <br />Appendix E.1 Concrete Testing Results <br />Appendix E.2 Concrete Batch Receipts <br />Appendix E.3 Concrete Embed Installation Guide <br />Appendix F Subgrade Acceptance Notification <br />Appendix G Geosynthetics CQC Documentation <br />Appendix G.1 Resumes of Installation Personnel <br />ameO <br />Appendix G.2 Geomembrane Resin Quality Control Certificates <br />Appendix G.3 Geomembrane Roll Manufacturer Quality Control Certificates <br />Appendix G.4 Welding Rod Quality Control Certificates <br />Appendix G.5 GCL Manufacturer Quality Control Certificates <br />Appendix G.6 Geotextile Roll Quality Control Certificates <br />Appendix H Geosynthetics Installation Observations <br />Appendix H.1 Geomembrane Deployment Summary <br />Appendix H.2 Geomembrane Trial Seam Summary <br />Appendix H.3 Geomembrane Extrusion Welding Summary <br />Appendix H.4 Geomembrane Defect/Repair Summary <br />Appendix H.5 Geomembrane Destructive Testing Summary <br />Appendix H.6 Geomembrane Non - Destructive Testing Summary <br />Appendix H.7 Geomembrane & GCL Acceptance Notification <br />Appendix I Geomembrane Conformance Testing <br />Appendix J Tensiometer Certification <br />