Cripple Creek & Victor Gold Mining Company <br />Lab Liner Extension <br />Photograph Log <br />ameO <br />Photo Number <br />Date <br />Description <br />1 <br />January 22, 2012 <br />Excavation and preparation of subgrade <br />2 <br />January 22, 2012 <br />Placement of GCL <br />3 <br />January 22, 2012 <br />Placement of GCL <br />4 <br />January 22, 2012 <br />Placement of GCL <br />5 <br />January 22, 2012 <br />Placement of GCL <br />6 <br />January 22, 2012 <br />Deploying Geomembrane <br />7 <br />January 22, 2012 <br />Preparing to anchor the geomembrane to the existing concrete <br />8 <br />January 22, 2012 <br />Preparing to anchor the geomembrane to the existing concrete <br />9 <br />January 22, 2012 <br />Preparing to anchor the geomembrane to the existing concrete <br />10 <br />January 22, 2012 <br />Determining the elevation of the geomembrane <br />11 <br />January 22, 2012 <br />Grinding the geomembrane to prepare to weld <br />12 <br />January 22, 2012 <br />Welding a corner of the geomembrane <br />13 <br />January 22, 2012 <br />Seaming geomembrane <br />14 <br />January 22, 2012 <br />Placing neoprene gasket between the geomembrane and existing concrete <br />15 <br />January 22, 2012 <br />Preparing to place the batten strip <br />16 <br />January 22, 2012 <br />Drilling holes for expansion anchors <br />17 <br />January 22, 2012 <br />Continuing to adhere geomembrane to existing concrete <br />18 <br />January 22, 2012 <br />Placing geotextile over the geomembrane <br />19 <br />January 22, 2012 <br />Sealing the top edge of the geomembrane connection to existing concrete <br />20 <br />January 22, 2012 <br />Continuing to adhere geomembrane to existing concrete <br />21 <br />January 22, 2012 <br />Placing concrete forms <br />22 <br />January 22, 2012 <br />Welding a corner of the geomembrane <br />23 <br />January 22, 2012 <br />Welding a corner of the geomembrane <br />24 <br />January 22, 2012 <br />Placing rebar <br />25 <br />January 22, 2012 <br />Placing rebar <br />26 <br />January 22, 2012 <br />Inspecting the work prior to concrete placement <br />27 <br />January 22, 2012 <br />Inspecting the work prior to concrete placement <br />28 <br />January 23, 2012 <br />Performing a slump test <br />29 <br />January 23, 2012 <br />Placing concrete <br />30 <br />January 23, 2012 <br />Concrete after finishing <br />31 <br />January 23, 2012 <br />Concrete blankets placed for winter protection <br />32 <br />January 24, 2012 <br />Removing formwork <br />33 <br />January 24, 2012 <br />Removing formwork <br />34 <br />January 24, 2012 <br />Concrete and geomembrane with formwork removed <br />35 <br />January 24, 2012 <br />Welding liner to Agru T -lock embed <br />36 <br />January 24, 2012 <br />Welding liner to Agru T -lock embed <br />37 <br />January 24, 2012 <br />Welding liner to Agru T -lock embed <br />38 <br />January 24, 2012 <br />Welding patches to connect new liner to existing liner <br />39 <br />January 24, 2012 <br />Using a grinder to clean up extruded welds <br />40 <br />January 24, 2012 <br />Using a grinder to clean up extruded welds <br />41 <br />January 24, 2012 <br />Preparing to place the batten strip <br />42 <br />January 24, 2012 <br />Hammering in expansion anchors <br />Page 1 of 1 <br />