Laserfiche WebLink
12 -inch diameter "N -12" CPe pipe, as manufactured by Advanced Drainage Systems, Inc., <br />or an equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER. <br />6. 16 -inch diameter "N -12" CPe pipe, as manufactured by Advanced Drainage Systems, Inc., <br />or an equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER. <br />18 -inch diameter "N -12" CPe pipe, as manufactured by Advanced Drainage Systems, Inc., <br />or an equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER. <br />8. 26 -inch diameter solid SDR I1 HDPE pipe, as manufactured by DRISCOPIPE or an <br />equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER. <br />B. Leak Detection Pipe: <br />3 -inch diameter, "Highway- Grade" CPe pipe, as manufactured by Advanced Drainage <br />Systems, Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER. <br />2. 3 -inch diameter, solid SDR 13.5 HDPE pipe or an equivalent approved by MANAGER, <br />DESIGN ENGINEER and CERTIFYING ENGINEER. <br />C. Low Volume Solution Collection Pipe: <br />18 -inch diameter solid SDR I1 HDPE pipe or an equivalent approved by MANAGER, <br />DESIGN ENGINEER and CERTIFYING ENGINEER. <br />2. 4 -inch "Highway Grade" perforated corrugated polyethylene (CPe) pipe, as manufactured <br />by Advanced Drainage Systems, Inc., or an equivalent approved by MANAGER, <br />DESIGN ENGINEER and CERTIFYING ENGINEER. <br />D. Underdrain Pipe: <br />4 -inch diameter "N -12" CPe pipe, as manufactured by Advanced Drainage Systems, Inc., or <br />an equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER. <br />PART 3: EXECUTION <br />3.01 INSTALLATION <br />A. CONTRACTOR shall install pipe according to MANUFACTURER'S recommendations. <br />B. CONTRACTOR shall take all precautions necessary to not damage the pipe during material <br />placement. CONTRACTOR may periodically be requested by MANAGER to verify that covered <br />pipe has not been crushed. Costs associated with proving pipes have not been crushed shall be borne <br />by CONTRACTOR. <br />Section 02710 <br />Piping <br />Page 2 of 3 <br />S1ProjectMARCHIVE CLOSED PROJECTS11125 CC &V Phase 5 VLF\I -Tech SpecsWrequa IFC SpecsX02710.r2.doc <br />May 3, 2010 <br />Revision 2 <br />