Laserfiche WebLink
INTEROFFICE <br />John Hickenlooper <br />Governor <br />MEMORANDUM <br />Mike King <br />Executive Director <br />TO: Mike Boulay Loretta E. Pineda <br />Director <br />FROM: Jim Stark <br />SUBJECT: New Horizon North 2012 Annual Reclamation Report Review <br />DATE: 21 January 2014 <br />Per Dan's request I have reviewed the 2012 New Horizon North's Annual Reclamation <br />Report. During the 2012 construction year the only work that was done at the mine was <br />preproduction work. Western Fuels built pond NHN1 and stripped and stockpiled <br />112,000 CY of mixed topsoil and 45,000 CY of Progresso topsoil, which is stockpiled <br />separately from the mixed topsoil. In all, 76.4 acres have been disturbed at the New <br />Horizon North Mine. All of the acreage numbers reported on the standardized ARR <br />Report form were consistent with the work performed at the site during 2012. <br />The Division does not have any questions or comments regarding the New Horizon <br />North's 2012 Annual Reclamation Report. Please let me know if you have any questions <br />or need any additional information. <br />